Industry
Crusher, conveyor and plant data with remote site monitoring for mining
We collect tonnage, downtime and equipment health data from crushing, screening, conveying and processing plants and move it reliably even from poorly connected sites.
Our clients
- Siemens
- Anadolu Isuzu
- BSH
- Tofaş
- Toyotetsu
- Martur
- Turkcell
- Vodafone
- Doğadan
- Pakmaya
- Bross
- Abdi İbrahim
- Nobel İlaç
- Plastimak
- Dalgıç Kalıp
- Barbaros Motor
- Magneti Marelli
- Rözmaş
- Sanel
Mine sites are far from town, network links are weak and equipment works in harsh conditions. An unplanned stop of the crusher, the main conveyor or a mill cuts the whole plant's tonnage, yet the reason and duration of those stops often stay in the shift log.
VOLSOFT reads data from the PLCs of crushing, screening and processing plants, belt scales and motor protection relays without touching control logic. Tonnage, run hours, stop reasons, motor currents and temperatures are collected on site and sent to the central system.
When a remote site loses its link, data is buffered at the edge and sent in full when the connection returns. Every project is built on Proxus.
What we deliver
Mining
-
Tonnage and production tracking
Tonnage from belt scales and the truck weighbridge is reported by shift, product and stockpile.
-
Crusher and conveyor downtime
Run and stop states of crushers, screens and conveyors are read from PLCs, stop reasons are classified and plant availability is calculated.
-
Equipment condition monitoring
Motor current, bearing temperature, vibration and belt misalignment are watched, and threshold breaches go to maintenance as alarms.
-
Remote site connectivity and buffering
When a cellular or satellite link drops, data is stored on site and sent in order when the link returns.
-
Energy consumption
Energy use of crushers and mills is metered and energy per ton is reported.
Processes we work on
Where the data starts in mining
- Primary and secondary crushers
- Conveyor belts and belt scales
- Vibrating screens
- Ball and rod mills
- Flotation and beneficiation
- Pumping and dewatering stations
- Truck weighbridges and stockpiles
- Underground ventilation fans
How a project runs
From discovery to live, step by step
- 01
Site survey
Plant PLCs, scales, motor protection devices and site network links are reviewed on site.
- 02
Edge and connectivity design
The on-site collection point, buffering and the path to the central system are designed around existing hardware or hardware the client chooses.
- 03
Pilot plant
Tonnage, downtime and condition monitoring go live at one crushing and screening plant, and the data is checked against shift records.
- 04
Rollout and support
Further plants and sites are added, operations and maintenance teams are trained and remote support is provided.
Built on Proxus
Proxus runs at the edge on remote sites, buffers data locally when the link drops and delivers it in full to the central system when the connection returns.
Proxus is the industrial data platform built by the VOLSOFT team.
Frequently asked questions
Common questions
How are conveyors and crushers monitored in mining?
Conveyor and crusher monitoring reads run and stop states from plant PLCs, tonnage from belt scales and current and temperature from motor protection devices. The data is recorded with stop reasons and shifts, and plant availability is calculated.
Is data lost at mine sites with weak connectivity?
No. Data is buffered at the edge on site and sent to the central system in order when the link returns. Local site screens can keep working without the connection.
What data is used for condition monitoring of mining equipment?
Motor current, bearing and winding temperature, vibration, belt speed and misalignment sensors are the most common. Where sensors are needed, existing hardware or hardware the client chooses is used; VOLSOFT does not sell devices.
Can tonnage data be sent to the ERP?
Yes. Belt scale and weighbridge data can be passed to the ERP and reporting systems by product, stockpile and shift.
How long does a monitoring project take at a mine site?
It depends on the number of sites and plants, the existing automation and the connectivity. Projects usually start with a pilot at one crushing and screening plant, and the scope is set during the discovery call.
Related pages
Often looked at together
- Solution Predictive Maintenance Condition monitoring with vibration, temperature and current data, anomaly alerts and CMMS links. Explore →
- Service Edge Computing Processing close to the machine, buffering through outages and rules that run on site. Explore →
- Solution Downtime Tracking Automatic stop detection, reason codes, Pareto analysis and MTBF/MTTR reporting. Explore →
- Solution Industrial IoT Solutions LoRaWAN and wireless field data: network design, integration and one model with PLC data. Explore →
- Solution Energy Monitoring Meter and analyzer data turned into energy per unit, EnPIs and ISO 50001 reporting. Explore →

Next step
Let’s turn your goal into a clear engineering scope.
Tell us about your plant, your machines and your goal. An integration engineer will set up a discovery call with you.